ISO 11295:2022
p
ISO 11295:2022
79752

Status : Published (To be revised)

This standard will be replaced by ISO/CD 11295
en
Format Language
std 1 194 PDF + ePub
std 2 194 Paper
  • CHF194
Convert Swiss francs (CHF) to your currency

Abstract

This document specifies the steps of the overall process of pipeline rehabilitation, comprising:

—    information on strategic and tactical activities:

a) investigation and condition assessment of the existing pipeline;

b) pipeline rehabilitation planning.

—    information on and requirements for operational activities:

c) project specification;

d) applications of techniques;

e) documentation of the design and application process.

Definitions and classification of families of renovation and trenchless replacement techniques are provided, and their respective features described. Areas of application covered include underground drainage and sewerage networks and underground water and gas supply networks.

The following aspects are not covered by the scope of this document:

—    new construction provided as network extensions;

—    calculation methods to determine, for each viable technique, the characteristics of lining or replacement pipe material needed to secure the desired performance of the rehabilitated pipeline;

—    techniques providing non-structural pressure pipe liners;

—    techniques for local repair.

It is the responsibility of the designer to choose and design the renovation or trenchless replacement pipeline system.

Read sample 

Preview this standard in our Online Browsing Platform (OBP)

General information

  •  : Published
     : 2022-01
    : International Standard to be revised [90.92]
  •  : 3
     : 67
  • ISO/TC 138/SC 8
  • RSS updates

Got a question?

Check out our FAQs

Customer care
+41 22 749 08 88

Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)