ISO/AWI 23817
Ships and marine technology — Ballast water management systems (BWMS)--Commissioning testing procedures for BWMS using electrolytic methods
Reference number
ISO/AWI 23817
Edición 1
Working draft
u
ISO/AWI 23817
87568
Un grupo de trabajo ha preparado un borrador.

Resumen

This document provides the guidance to perform commissioning testing for ballast water management system (BWMS) using electrolytic methods following the installation on board a ship. It specifies the procedures for installation inspection, commissioning to test the BWMS, biological efficacy verification and training of crews, in order to verify the BWMS functions and operates properly.

Informaciones generales

  •  : En desarrollo
    : Nuevo proyecto registrado en el programa de trabajo TC/SC [20.00]
  •  : 1
  • ISO/TC 8
  • RSS actualizaciones

Got a question?

Check out our FAQs

Customer care
+41 22 749 08 88

Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)